Underpinning

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Required Documents

  1. Structural engineer report. Not an architects report except under approval from building official.
  2. 3 copies of structural engineering drawings sealed by licensed design professional indicating scope of work.

A permit is required for underpinning.

Link

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer